Underground cable installation machines. Learn about underground wiring and cable installation and replacement. Replacing or installing underground wiring or cable lines. The l2 line layer s sewing machine like motion allows it to cut the ground and install the wire. Most utilities are currently using one or more of these methods with various degrees of success.
Learn about underground wiring and cable installation and replacement. Directional boring hdd offers significant environmental advantages over traditional cut and cover. To select the correct spacers for the blowing machine. Lawn garden equipment cable installer e z trench category 08 group 856.
Omac manufactures machines for laying underground cables and related equipment. Machinery and equipment for underground cable laying. Underground wire pulling can be completed faster and leave barely any damage simply a slit in the ground. For the installation of low voltage wiring such as underground pet containment fences and landscape lighting.
The three most common methods of cable placement are direct buried cable in conduit and a total conduit system. The range of machines manufactured by omac covers all types of hydraulic pullers specifically designed for laying low medium high voltage underground cables fiber optic and for pipes renewal. Cable pull materials equipment. Condux machines allow safe quick and easy installation of fiber optic cable and power cables.
What makes cable installation so simple with the l2 line layer are the special features unique to the cable installation industry. Further the vertical runs where the cable descends into the ground at the house side and emerges up from the ground at the outbuilding. The cable must lie snug in the v groove between the drive rollers. What we do condux international the premier manufacturer of underground and overhead cable installation tools and equipment for the telecoms and electric power markets.
To ensure that the cable is not prone to slipping push and pull the cable through the machine by hand a few times to ensure that the cable is seated. Laying uf underground feeder cable directly into the ground this is known as direct burial and if you do this the uf cable must be at least 24 inches below the surface of the ground to minimize the chance of the cable being pierced by routine shoveling. Regards to equipment and procedures for underground cable installation. Description model tp400cl3.
Directional boring also referred to as horizontal directional drilling hdd is a minimal impact trenchless method of installing underground utilities such as pipe conduit or cables in a relatively shallow arc or radius along a prescribed underground path using a surface launched drilling rig.